mr fixit      
Translation
Terjemahan
Specialists in Property Inspection, Renovation and Maintenance
Home
divider
About Mr Fixit
divider
Contact Us
Inspections and Surveys
divider
Renovations
divider
Products
divider
Property Maintenance
divider
Pest Control
Air Conditioner Calculator
divider
PLN Bill Calculator
Free Hot Water!
wika heater
Connects into any standard air conditioner using the heat your air conditioner extracts to heat your water. more info.........
❝The Tale of a Wail❞

About three weeks ago I was walking along the beach quietly minding my own business when my ears were suddenly assaulted by a terrible sound. It was a sort of wailing, you know, the sort of noise you hear in an Aussie pub when a housewife suddenly realises she has lost the fortnight's house keeping money in a one armed bandit and she has got only 30 minutes before her bloke gets home and wants his tea on the table.

I looked around – no, no beached wail anywhere, but there it was again. It was deeper this time, more of an anguished “Manchester United losing 3-0 at home to Tranmere Rovers” sort of sound that tore at your very soul. It seemed to be coming from a recently renovated restaurant. I peered into the gloomy interior and saw a man sitting humpbacked over a table, his shoulders slumped and his head in his hands.

The IWC (International Wailing Commission) advises that wailing is only permitted in Bali for scientific purposes. This man was clearly no scientist although the piece of paper he was studying did look rather like a very expensive lab. report.

I approached him with concern. “What's wrong?” I asked “is your girlfriend pregnant?”
“No” he replied (not a sperm wail then).
“I sank my life's savings into this place, I am struggling to make ends meet and now I get an electricity bill for Rp 4 million! Last month it was less than Rp 2 million.”
He looked at the lab report once again his bottom lip starting to quiver.
“I don't feel well” he wailed, “my B. Beban is all right but my Tarip Non Subsidi has gone through the roof!”

Then I recognised that horrific sound, it was the sound of money being rent from a poor unsuspecting businessman's wallet.

Confused? Let me try and clarify things.

Back in August 2007 (see “Counting Electrons”) I explained how to read your PLN electricity bill. Since then there have been some changes. The bills themselves are now smaller (sorry, not in financial terms) and with a different, harder to decipher, format. Back in August I didn't mention business rates which we need to look at, but most importantly on the 1st of April 2008 PLN stopped fully subsidising high electricity users resulting in hefty increases to some power bills.

Let us look again at what has become an even more cryptic piece of paper. Set aside a spare day or two, take a couple of Valium, pull out a recent bill and we'll try and make some sense of it.

Let us look again at what has become an even more cryptic piece of paper. Set aside a spare day or two, take a couple of Valium, pull out a recent bill and we'll try and make some sense of it.

Above is our poor unfortunate wailer's bill. The translation below will help I hope. Let us start at the top right hand corner, here you will see the billing date. Below this the underlined heading states the billing month.

The first section of the bill itself is obvious: IDPEL/NOPEL, NAMA, ALAMAT is the customer ID, bill number, name and address.

Note that a very important piece of information is provided in brackets at the right hand end of the second line of the bill. This is the tariff (TARIP) and the maximum allowed rate of power usage (DAYA). In the above bill B2 / 7700 indicates a business tariff B2 and a maximum power of 7,700 watts (at 220 volts this is 35 amps). 7,700 watts is of course the same as 7.7 kilowatts.

Now we get to the nitty gritty. STAND LWBP (Luar Waktu Beban Puncak) means “usage offpeak load”. The first number (118599) is the latest meter reading in kilowatt hours, the second number (115435) is the former meter reading and the third number (3114) is the number of kilowatt hours used during the billing period.

Don't worry about the next two lines, STAND WBP (Waktu Beban Puncak) in fact means “usage at peak load” but this and the next line STAND KVARH are only used for high usage customers such as large factories.

B BEBAN (BIAYA BEBAN) is the fixed charge you have to pay. This varies according to the rate you are on and the maximum rate of power usage you are allowed. The chart below gives all the rates and the fixed charge calculations. The word ANGUR means “instalment” and is for part payments.

B PAKAI (BIAYA PAKAI) is the charge for subsidised electricity used. This has changed. It used to be that all power usage was charged at the subsidised rate. The subsidised rate is still the same as before and varies according to the tariff you are on from Rp 254 per kilowatt hour on a B1 / 450 watt tariff to Rp 610 per kilowatt hour on an R3 tariff greater than 7,700 watts.

On April 1st 2008 a new system was introduced designed to penalise heavy power users. If you are on an R3 or B2 tariff of 6,600 watts or more you now have a monthly allowance of kilowatt hours which is charged at the subsidised rate. Usage more than this allowance is charged at the none subsidised full cost of electricity which is currently Rp 1,380 per kilowatt hour. Many people are using considerably more then their subsidised allowance and this is why they have suddenly found substantial increases in their power bills. The bill above increased by Rp 2 million.

Working out this allowance is a rather strange calculation based on an allowed number of hours per month at the maximum power usage, yes I know your eyes are glazing over but don't worry, in the chart below I have calculated the subsidised allowance in kilowatt hours per month for each tariff rate (column F).

TARIP NON SUBSIDI is a new line on your bill and is the number of kilowatt hours above the subsidised allowance charged at the full none subsidised rate of Rp 1,380 per kilowatt hour.

Note that this TARIP NON SUBSIDI line is in fact out of order on your bill because it is in fact included in the total REKENING. The REKENING is the subtotal in Rupiah for electricity charges and is: the fixed charge (B BEBAN) plus the subsidised power charge (B PAKAI) plus the none subsidised power charge (TARIP NON SUBSIDI).

The next line on the bill, MATERAI, is stamp duty of Rp 6,000 charged for the bill.

Towards the bottom of the bill are two more charges, these are PPJ and PPN. PPJ is a charge of 5% of the REKENING for street lights and PPN is 10% government tax. Note that PPN is applied to residential tariffs R1, R2 and R3 but not to business tariffs B1, B2 and B3.

Finally TAGIHAN is the amount to be paid which is the REKENING plus the MATERAI plus the PPJ plus the PPN. TERBILANG is the TAGIHAN written in words.

Now I have totally confused you I will finish you off with a chart:

To calculate your bill let us say you have used Q KWH (Kilowatt hours) in the month and this is less than your subsidised limit F above:
Residential R tariffs: Business B tariffs:
Fixed Charge (B BEBAN) C C
+ Subsidised Usage (B PAKAI) Q x D Q x D
= Sub total (REKENING)
+ Stamp duty (MENTAI) Rp 6,000 Rp 6,000
+ Street Lamps charge (PPJ) 5% of REKENING 5% of REKENING
+ Government Tax (PPN) 10% of REKENING no tax
= Total Invoice (TAGIHAN)

If your usage Q is more than your subsidised allowance:
Residential R tariffs: Business B tariffs:
Fixed Charge (B BEBAN) C C
+ Subsidised usage (B PAKAI) D x F D x F
+ None subsidised usage (Q – F) x Rp 1,380 (Q – F) x Rp 1,380
= Sub total (REKENING)
+ Stamp duty (MENTAI) Rp 6,000 Rp 6,000
+ Street Lamps charge (PPJ) 5% of REKENING 5% of REKENING
+ Government Tax (PPN) 10% of REKENING no tax
= Total Invoice (TAGIHAN)

You have, of course, long ago given up trying to understand and drifted off into a deep troubled sleep dreaming of those little electrons hurtling down the wires causing that meter to spin at millions of revs to the merry jingle of money falling into cash registers far, far away..........

Phil Wilson

Copyright © Phil Wilson 2009
This article or any part of it cannot be copied or reproduced without permission from the copyright owner.

Air Conditioners - introduction
divider
Air Conditioners - inverter
divider
Air Conditioner - refrigerants
divider
Air Con. Water Heaters
divider
Architecture - unsafe design
divider
Building local permission
divider
Building permits IMB
divider
Buying Property
divider
Buying Property with care
divider
Carpets
divider
Chimneys and flues
divider
Concrete roof sealing
divider
Corrosion and rust
divider
Cracks in buildings
divider
Dampness in walls
divider
Drainage
divider
Earthquakes introduction
divider
Earthquakes and building
divider
Earthquakes and design
divider
Earthquake risk in Bali
divider
Electricity bill introduction
divider
Electricity bill calculation
divider
Electricity bill update
divider
Electricity contracts
divider
Electricity - earth connections
divider
Electricity high consumption
divider
Electricity - how to save 1
divider
Electricity - how to save 2
divider
Electrical power savers
divider
Electricity safe installation
divider
Electricity safety
divider
Electricity stealing
divider
Electricity supply problems 1
divider
Electricity supply problems 2
divider
Float valves
divider
Floor tiles
divider
Foundations
divider
French door design
divider
Gas cylinder safety
divider
Generators
divider
Insurance for buildings
divider
Land certificates
divider
Land access
divider
Leaky concrete roofs
divider
Leaking windows
divider
Light bulbs - halogen spots
divider
Maintenance and Balinese attitude
divider
Minimalist Architecture
divider
Mosquitoes
divider
Paint coatings - a primer
divider
Painting walls and masonry
divider
Planned Obsolescence
divider
Plumbing quality of fittings
divider
Plumbing - smelly drains
divider
Rabies
divider
Reinforced concrete
divider
Renting out your property
divider
Roofs - general
divider
Roofs gutters
divider
Roofs - leaking
divider
Roofs - low cost materials
divider
Roof venting & insulation
divider
Quality
divider
Septic and sewerage
divider
Solar water heaters
divider
Soil tests
divider
Swimming pools
divider
Termites
divider
Terrazzo
divider
Toilets
divider
Traditional wooden houses
divider
Trees
divider
Wall linings
divider
Water and Bali Belly
divider
Water contamination
divider
Water - hard water
divider
Water meter and leaks
divider
Waterproofing walls
divider
Waterpumps - how big?
divider
Water systems
divider
Water tables and shortages
divider
Water tanks
divider
Water testing